The purpose of this activity is to assemble all of the components into the solution in a predetermined way, within the
specific timeframes called for in the solution plans and commitments. The integration work performed in this activity
includes the broad range of components necessary for solution acceptance, such as:
-
Hardware components
-
Software modules
-
Installation scripts
-
Operating procedures
-
Education
It further includes putting the newly integrated components into the cumulative development environment and updating
Configuration Management records to reflect the results of integration and migration.
|